What is in scope
Loop piping covers the stainless distribution network downstream of the CDU outlet flange: supply and return headers, CDU-to-rack runs, risers and prefabricated spools. Each spool is cut, formed and welded to the branch geometry and port positions in the approved drawing.
Made to the drawing
Lengths, bend radii, flange standards and branch orientations are taken from the project drawing set. Fabricated modules are staged and protected before handoff, and supports or frames can be integrated where the layout requires them.
Boundary note
The coolant distribution unit is equipment you select and buy; this page covers the fabricated pipework around its outlet flange, not the CDU unit. We do not manufacture CDU units.
Have a drawing to review?
Send the drawings. We review the build.
Geometry, interfaces and quantities come from your released drawing. Tell us the loop and the interfaces you need to meet.