In one paragraph
Secondary-side loop piping is the stainless steel distribution network that carries conditioned coolant from the coolant distribution unit (CDU) outlet flange to the rack manifolds and returns it to the CDU. Also called the technology cooling system (TCS) loop or the secondary fluid network (SFN), it is the part of a liquid-cooled data hall that YiJia Cool fabricates. We build these loops to the approved drawing in seamless AISI 304 / 316L stainless tube, and verify each custom assembly against the inspection and test requirements stated in the project specification.
The equipment, the packaged solution and the fabricated pipework are supplied by different parties; our liquid cooling solutions supply-scope guide sets out that split and how to write an RFQ around it.
What sits on either side of the CDU outlet flange?
A liquid-cooled data hall has two coolant circuits separated by the coolant distribution unit. Facility water reaches the CDU on one side; conditioned coolant leaves it on the other and travels to the racks. The flange where that conditioned coolant exits the CDU is the practical boundary of our scope.
Downstream of that flange, the pipework is what specifiers call secondary-side loop piping, secondary-side liquid cooling loop piping, or SFN piping. It includes the supply and return headers, row and rack manifolds, CDU-to-rack piping runs, prefabricated spools and the fittings that join them. Upstream of the flange — the facility water side and the rack IT equipment — is not something we supply. The CDU unit itself is customer-selected equipment that we integrate into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules; it is not a unit we manufacture.
That distinction matters when a drawing set arrives. A P&ID will often show both circuits on one sheet, and a bill of materials may group them under a single mechanical package. If the boundary is not marked, the first thing our engineering review does is confirm which side of the CDU each line belongs to. For the terminology in full, including FWS, PFN and the FWS / TCS boundary, see our guide to the primary loop vs secondary loop.
What does a secondary-side loop actually contain?
A loop is not a single part. It is a set of fabricated components whose geometry is fixed by the rack layout, the CDU connections and the maintenance envelope. We manufacture the following in-house, then assemble and check them as one drawing-controlled package.
| Component | Where it sits | What we need from the drawing |
|---|---|---|
| Supply and return headers | Between the CDU outlet and the row branches | Line sizes, flow rates, isolation points, branch positions |
| Row and rack manifolds | Along a row or inside a rack, feeding individual branches | Port count, port pitch, connection type, surface treatment |
| CDU-to-rack piping | The runs between the CDU and the first distribution point | Interface points, routing envelope, allowable joint methods |
| Prefabricated spools and rack drops | Final distribution to the rack connection | Cut lengths, bend radii, end preparations, identification marks |
| Press and weld fittings, interfaces | Every joint in the loop | V / M profile or welded ends, threaded or flanged connections |
The row and rack manifolds fix the branch geometry, so their dimensions are usually the hardest to change once a drawing revision is issued. A secondary-side loop manifold is therefore reviewed together with the headers and spools that connect to it, not in isolation. A tolerance that looks harmless on one manifold can accumulate across a twelve-branch header — the effect is set out in our note on tolerance stack-up on multi-port manifolds.
How is TCS loop piping specified differently from facility water piping?
TCS loop piping sits above live electronics. That single fact drives most of the specification. A leak on the facility water side is a maintenance problem; a leak over a rack is a loss event. The coolant chemistry, the internal surface condition, the joint method and the verification record are therefore reviewed as one decision rather than as separate line items.
In practice this means three things. First, the coolant is specified by the project — deionised water, a glycol blend, or another approved fluid — and the material grade, wall thickness and cleaning regime are checked against it. Second, the joint strategy follows the coolant, the access available during installation, and the service life expected of the loop. Third, the acceptance criteria belong in the project specification, not in a catalogue. We do not publish a universal leakage figure, because a number divorced from the test method, the stabilisation time and the assembly volume is not meaningful.
Within materials and fabrication, we work in seamless AISI 304 / 316L tube with argon-shielded TIG and orbital welding, V / M-profile press fittings, passivation, and dimensional inspection. The choice between grades is driven by coolant chemistry rather than by price; how we frame 304 vs 316L is set out in a separate note.
Which joint methods do we use, and how is one chosen?
There is no default joint. A pressed connection avoids hot work in a live white space but needs room for the tool and a defined inspection method. An orbital weld gives a consistent internal bead where the tube is accessible and the purge can be controlled. A threaded or flanged connection may be right where a loop has to be broken for maintenance.
Our engineering review looks at four things before fixing the joint strategy: the coolant and its compatibility with the wetted materials, the access available at each joint during fabrication and later in service, the restrictions on hot work inside the data hall, and the inspection or test record the specification requires. Choosing a joint by access goes through the trade-offs in detail.
UQD, blind-mate and valved interface parts are purchased components. We integrate them into prefabricated assemblies to the approved drawing so the loop can be assembled on site — an on-site assembly service we can also provide — but we do not manufacture those connectors and do not present their approvals as our own. What we control is the pipe, the weld, the fit-up and the record around them.
How are CDU-to-rack piping runs prefabricated?
CDU-to-rack stainless steel piping is cut, formed, welded and passivated in our Foshan workshop against the approved drawing revision, then packed as labelled spools. Prefabrication moves hot work and factory verification out of the live hall. Branch positions and isolation points are fixed at engineering review against the CDU and rack envelope, so the installer receives parts that match the drawing rather than material to be reworked on site.
The sequence is described in one prefabricated spool, from drawing to shipment: drawing analysis produces a proposed piping solution and manufacturability questions before any material is committed; the joint strategy is agreed; fabrication and dimensional inspection follow; the verification record travels with the packed assembly. We fabricate and factory-assemble. On-site assembly, start-up and final system acceptance are outside our scope — see custom fabrication and assembly for what a drawing-based engagement includes.
What verification travels with the assembly?
Custom liquid cooling assemblies are inspected and verified before shipment against the test, inspection and documentation requirements stated in the project specification. Dimensional checks and the verification record are tied to the drawing revision and travel with the packed assembly. Material documentation and heat-level traceability are agreed with the order and stated in the project specification, rather than assumed by us.
Two boundaries are worth stating plainly. The numeric acceptance limit belongs in your project specification; how an acceptance criterion is set explains why we ask for it at engineering review instead of assuming one. And documentation of a material or a process is not a system-level approval of an installed loop. The scope of material documentation is set out under materials and fabrication.
What do we need from you to quote a secondary-side loop?
The quote follows the drawing, so the useful enquiry is the one that lets our engineers check manufacturability. Send what you have of the following:
- Drawing set. A P&ID, isometric, CAD package or marked-up sketch, with the drawing revision.
- Operating envelope. Coolant type and chemistry, flow rates per branch, temperature and pressure envelope.
- Interfaces. Connection points, types and sizes at the CDU and at the rack.
- Manifold geometry. Port count and pitch, plus the maintenance and routing envelope.
- Material and documentation. Grade, wall thickness, surface treatment and the documentation the project requires.
- Commercial inputs. Quantities, acceptance criteria, required records and project stage.
An engineering sample can be produced before batch production, and lead time is quoted against the approved drawing. Where the drawing is incomplete, our review returns the manufacturability questions rather than a price built on assumptions.
Short answers before you send a drawing
Do you manufacture the CDU or supply the facility water side?
No. We are not a CDU vendor and do not build CDU units; the facility water side is outside our scope. We do integrate the CDU you select into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules. CDU connection piping and CDU-to-rack piping refer to the secondary-side lines and interfaces, not to the CDU unit or its internal components.
Is the loop a catalogue product?
No. Port counts, interfaces, dimensions and acceptance criteria are set per project. We maintain base component families, but a complete loop is engineered to the approved drawing rather than selected from a fixed SKU list.
Can you work from a P&ID instead of a full CAD package?
Yes. A P&ID with flow rates, coolant type and interface points is enough to start. We analyse the loop, propose a custom piping solution and list the dimensions still needed before fabrication.
Can you take a drawing through to on-site assembly?
Yes. We analyse the drawing, propose a fit-for-purpose custom piping solution, build and integrate the assemblies, and support on-site assembly. Final system acceptance stays with the parties named in the project specification.
Can customer-selected components be used?
Yes. Purchased interface parts can be integrated into a prefabricated assembly to the drawing. We specify the fit-up and verify the finished assembly; we do not manufacture the connectors or present their approvals as our own.
Which markets do you support?
Data center projects in the United States and Malaysia. We fabricate in Foshan, China; enquiries, drawings and records are handled in English, and the quotation follows the approved revision. We do not claim local offices or certification in these markets.