Quick contact WhatsApp +86 15975701348 Email fantine.yijia@gmail.com
YiJia CoolSecondary-side piping & manifolds Request a Quote
Stainless fabrication floor · Foshan, China Piping / Manifolds

Custom liquid cooling piping
engineered from your drawing.

Stainless steel piping, rack and row manifolds, CDU connection modules and flow components — fabricated, integrated and assembled from your released drawing.

Product families

What we build

Four families cover the secondary-side flow path, and rack and row manifolds are our primary focus. Geometry, interfaces and quantities are set by the project specification rather than pulled from a fixed SKU list.

Prefabricated stainless steel pipe module with U-bend runs, flanges, valves and a support frame

Stainless Steel Loop Piping

Supply and return headers, CDU-to-rack runs and prefabricated spools, cut, formed and welded in AISI 304 / 316L to the drawing.

Loop piping and spools →
Stainless CDU-side piping connection module with flanged standpipes, a valve train and a flexible braided hose

CDU Connection Modules

Piping assemblies that connect at the CDU outlet flange and set the first supply and return take-offs. Part of CDU liquid cooling piping product integration — pipework modules, not CDU equipment.

See the loop boundary →
Stainless quick-disconnect couplings, tri-clamp fittings, an elbow and a braided hose arranged on a bench

Flow Components, Integrated

Customer-specified valves, quick disconnects, hoses and fittings integrated into prefabricated assemblies to the approved BOM. These are purchased parts.

Fittings and interfaces →

Built to specification · United States · Malaysia

Custom Liquid Cooling Pipework, from Loop Analysis to On-Site Assembly

YiJia Cool builds non-standard liquid cooling pipework to specification: stainless piping, rack and row manifolds, liquid cooling manifolds, CDU connection modules and integrated prefabricated assemblies. Our capability chain is one continuous line: custom non-standard pipework, drawing analysis, a fit-for-purpose piping and integration solution, integrated prefabrication, on-site assembly, and CDU liquid cooling piping product integration — integrating the CDU you select into the piping package through its interfaces, valve groups, bypasses, supports and connection modules. There is no fixed catalogue: every package is engineered around one project's loop.

What we can take on. One chain: custom non-standard liquid cooling pipework → drawing analysis → a fit-for-purpose piping solution → integrated prefabrication → on-site assembly → CDU liquid cooling piping product integration. CDU integration means the unit you select, supplied by you or your CDU vendor, is built into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules. We are not a CDU vendor and do not manufacture CDU units. Pumps, cold plates and quick-disconnect connectors are likewise customer-selected parts we integrate rather than manufacture. Final system acceptance stays with the parties named in the project specification.
Non-standard custom workNo fixed SKU list. Every spool, port and interface is engineered to your drawing.
One capability chainNon-standard pipework, drawing analysis, a proposed solution, integrated prefabrication, on-site assembly and CDU piping integration.
Two markets, one languageProject teams in the US and Malaysia; drawings and records in English.
Secondary-side loop piping scope diagram A CDU on the customer side, a dashed line at the CDU outlet flange marking the scope boundary, and YiJia Cool fabricated supply and return headers, a row manifold and rack connections on the secondary side. CDU customer-selected equipment CUSTOMER SCOPE OUTLET flange = boundary supply header return header RACK 01 RACK 02 RACK 03 RACK 04 row manifold YIJIA COOL FABRICATED SCOPE · TCS / SFN
Scope diagram — the CDU outlet flange is the practical boundary of our fabrication work.

The fabrication floor

A real pipe shop, not a catalogue

Every package is cut, formed, welded and fitted around one released drawing revision. The four capabilities below are performed on our own floor or supported by the same team on site.

Rows of prefabricated stainless steel piping assemblies staged on the fabrication floor before protected handoff
Prefabricated assemblies staged on our own floor. Port count, pitch, branch geometry and interface standard come from the released drawing, not from a fixed catalogue.
01 / FABRICATION

Cutting, forming and welding

AISI 304 / 316L stainless pipework cut, formed and welded on our own floor to the geometry in the released drawing.

02 / NON-STANDARD

No fixed SKU list

Port count, pitch, orientation, branch geometry and interface standard come from your drawing, not from a preset product table.

03 / INTEGRATION

Integrated prefabrication

Valve groups, bypasses, supports and CDU connection modules assembled into one piping package before it leaves the floor.

04 / ON SITE

On-site assembly support

The team that prefabricated the package can support fit-up and assembly at the project site, to the agreed scope.

Markets served

Which markets do we work in?

YiJia Cool supplies fabricated secondary-side pipework for data center projects in the United States and Malaysia. Enquiries, drawings, BOMs and inspection records are handled in English. We fabricate in Foshan, China and ship to the destination agreed in the order; we do not maintain offices, warehouses or local certification in these markets. Country-specific standards and units come from the project specification rather than being assumed.

Where does YiJia Cool supply liquid cooling pipework? YiJia Cool is a Foshan-based fabricator of specification-built stainless secondary-side pipework, rack and row manifolds, CDU connection modules and prefabricated spools. It works with specifiers, mechanical contractors and procurement teams on data center projects in the United States and Malaysia, building to released drawings and approved BOMs. We can support on-site assembly of the piping package; local approval and final system acceptance remain with the parties named in each project specification.

United States

AI and high-density data hall projects where rack manifolds and prefabricated spools are released against a drawing revision before material is committed.

Malaysia

Data center build-outs receiving labelled, capped and protected assemblies. Export packing, documentation and destination are agreed with the order, not preset by market.

Scope clarity

Where does our scope start and stop?

A drawing set often shows both coolant circuits on one sheet. Before material is committed, our engineering review confirms which side of the CDU outlet flange every line belongs to. The split below is the fastest way to qualify a project.

Responsibility split on a typical secondary-side piping package
Customer / design team definesYiJia Cool analyses, builds and integrates
  • Cooling architecture, P&ID and drawing revision
  • CDU selection and interface standard
  • Coolant chemistry, flow and pressure targets
  • Loop analysis and a fit-for-purpose piping solution
  • Secondary-side headers, row and rack manifolds
  • CDU-to-rack runs and integrated prefabricated spools
  • Acceptance criteria and inspection points
  • Labelling rules, packing method and destination
  • Final system acceptance
  • Cutting, forming, welding, passivation and fit-up
  • CDU and purchased-component integration into assemblies
  • On-site assembly support and protected delivery

UQD and blind-mate interface parts, pumps and CDU units are purchased or customer-selected components. The CDU you select is integrated into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules, to the approved drawing; we do not manufacture the CDU unit or those purchased items, and we do not claim their certifications as our own.

Stainless supply and return piping running along a row of unbranded data centre racks with capped branch ports
Secondary-side supply and return pipework downstream of the CDU outlet flange, with branch ports protected for handoff.
Liquid cooling solutions · supply scope

Who supplies what in a liquid cooling solution?

Buyers searching for liquid cooling solutions, CDU vendors, turnkey cooling solutions, pumps or cold plates are usually looking at the whole cooling chain, not one component. Those items are selected by the design team and its equipment vendors. Our part of that chain is the fabricated piping, rack manifold and liquid cooling manifold downstream of the CDU outlet flange.

Which supplier covers which part? A turnkey cooling solution is the overall package assembled by the party named in the project specification. CDU vendors supply the coolant distribution unit; pumps and cold plates are equipment selected within that architecture. YiJia Cool delivers the custom piping and integration solution inside that package: we analyse the drawing, propose the pipework arrangement, manufacture non-standard stainless piping, rack manifolds and liquid cooling manifolds, integrate the CDU you select into the piping package through interfaces, valve groups, bypasses, supports and connection modules, and support on-site assembly. We are not a CDU vendor and do not manufacture CDU units, pumps, cold plates or connectors, and final system acceptance stays with the parties named in the specification.

Seven terms buyers search, and where YiJia Cool fits
Search termTypically supplied byOur role
rack manifoldFabricated assembly within the piping packagePrimary product. Built to the released port layout and revision.
liquid cooling manifoldFabricated distribution headerPrimary product. Format, joints and internal surface agreed before material is committed.
pipingSecondary-side pipework specialistCore work. Supply / return headers, CDU-to-rack runs and prefabricated spools.
cdu vendorsEquipment manufacturer chosen by the design team; the CDU unit is their product, not oursCDU liquid cooling piping product integration: we build the chosen CDU into the piping package — outlet-flange interfaces, valve groups, bypasses, supports and connection modules. We are not a CDU vendor.
turnkey cooling solutionsThe party named as responsible for the overall packageWe deliver the custom piping solution within it: analysis, proposal, integrated prefabrication and on-site assembly.
pumpsCDU vendor or circulation package supplierWe integrate the pump package into the assembly and build the connecting pipework, supports and interfaces.
cold platesIT hardware or thermal vendorWe build the manifolds and branch lines feeding the rack interface, and integrate their connection hardware.

Purchased flow components are integrated as purchased parts to the approved BOM, not manufactured by us. See the full liquid cooling solutions supply-scope guide for the RFQ checklist and the boundary diagram.

Build path

How does a drawing become an installed piping system?

Six capabilities in one chain: custom non-standard liquid cooling pipework, drawing analysis, a fit-for-purpose piping solution, integrated prefabrication, on-site assembly and CDU liquid cooling piping product integration. The process below shows how a drawing becomes an installed package. Because the work is non-standard, the analysis and the proposed solution come before any material is committed — not after.

  1. Send the drawingP&ID, isometric or CAD package with interfaces, coolant, flow targets and revision.
  2. Analyse & proposeWe study the loop and return a fit-for-purpose piping and integration solution with manufacturability questions.
  3. Agree build detailsGrade, joint method, CDU and component choices, labels, packing and site requirements are aligned to the revision.
  4. Fabricate & integrateBespoke spools, manifolds, CDU connection modules and purchased parts become integrated prefabricated assemblies, with the customer-selected CDU built into the piping package at its outlet-flange interfaces, valve groups, bypasses, supports and connection modules.
  5. Assemble on siteCleaned, labelled and protected assemblies are delivered, with on-site assembly support to the agreed scope.
Close view of a uniform orbital weld bead on a stainless tube held in a fabrication fixture
Cutting, forming and orbital welding are done on our own floor to the geometry in the released drawing revision.
Engineering notes

The decisions specifiers ask about before release

Most quoting delays come from four questions that a catalogue cannot answer. We publish the reasoning, the trade-offs and the limits in writing, so an engineering review starts from a shared vocabulary.

NOTE 01

304 vs 316L for coolant-wetted parts

How coolant chemistry, not price, drives grade selection — and what the drawing has to state.

Read the note →
NOTE 02

Press vs orbital weld vs threaded

Choosing a joint by coolant compatibility, tool access, hot-work restrictions and the required inspection record.

Read the note →
NOTE 03

Tolerance stack-up on multi-port manifolds

Why a harmless-looking tolerance on one branch accumulates across a twelve-branch header.

Read the note →
NOTE 04

Primary loop vs secondary loop

A specifier's guide to the boundary, the terminology and which piping scope belongs downstream of the flange.

Read the guide →
Definition

What is specification-built liquid cooling pipework?

Specification-built liquid cooling pipework is non-standard stainless secondary-side piping engineered to the dimensions, materials and interfaces of a project drawing rather than selected from a catalogue. It covers the supply and return headers, rack and row manifolds, CDU connection modules, CDU-to-rack runs, integrated prefabricated spools and rack drops downstream of the CDU outlet flange, together with the CDU and purchased flow components integrated to the approved BOM. In data center specifications this circuit is also called the technology cooling system (TCS) loop or the secondary fluid network (SFN). Because the work is custom, the deliverable normally includes drawing analysis, a proposed piping solution and on-site assembly support, not just the fabricated parts.

The boundary matters because a P&ID commonly shows both coolant circuits on a single sheet. Downstream of the flange, coolant sits above live electronics, so coolant chemistry, internal surface condition, joint method and the verification record are reviewed as one decision. The CDU unit itself is customer-selected equipment: we integrate it into the piping package, but we do not manufacture it. The IT equipment and everything upstream of the flange belong to other parties in the project specification. A drawing revision, a BOM and an agreed acceptance protocol are what turn that boundary into a buildable package.

What does CDU liquid cooling piping product integration include?

CDU liquid cooling piping product integration at YiJia Cool means taking the coolant distribution unit selected and supplied by the customer or its CDU vendor, and building it into the custom piping package. The integration work covers five items around the unit: outlet-flange interfaces, valve groups, bypasses, supports and connection modules. We read the flange geometry, connection standard and take-off positions from the vendor's interface data on the project drawing, analyse the loop, and propose the piping arrangement around them, so the assembly arrives as a site-ready package rather than a set of loose spools.

We are not a CDU vendor and do not manufacture CDU units, CDU-internal distribution blocks, pumps, cold plates or CDU controls. The CDU stays customer-selected equipment; our deliverable is the non-standard pipework and the integration work that connects it to the rack interfaces. That distinction is written into the RFQ so a quote never includes the CDU's internal components or presents the vendor's certifications as our own.

The five items we fabricate and fit around a customer-selected CDU
Integration itemWhat we build into the piping packageFixed by
InterfacesOutlet-flange connection pieces and the first supply and return take-offsCDU vendor flange data on the drawing
Valve groupsIsolation and balancing valve assemblies and their connecting spoolsP&ID and approved BOM
BypassesBypass legs and the spools that tie them into the headersLoop analysis and the released drawing
SupportsBrackets, hangers and fixing points carrying the integrated packageLayout and maintenance envelope
Connection modulesPrefabricated modules joining the CDU outlets to the distribution headersApproved drawing revision

For a full terminology map, see primary loop vs secondary loop; for our main product line, see rack and row manifolds; for who supplies what, see the liquid cooling solutions supply-scope guide.