Quick contact WhatsApp +86 15975701348 Email fantine.yijia@gmail.com
YiJia CoolSecondary-side piping & manifolds Request a Quote

Home/Products/CDU connection modules

Products · CDU piping integration

CDU Connection Modules: piping at the outlet flange

Piping assemblies that connect at the CDU outlet flange and set the first supply and return take-offs, built around the CDU you select.

Stainless steel piping connection module with flanged risers and a bypass loop on a workbench
Fabricated stainless pipework and connection hardware for secondary-side liquid cooling loops.

Where the connection sits

A CDU connection module is the fabricated pipework that starts at the CDU outlet flange: the first supply and return take-offs, valve train, bypass and the supports and connection modules that carry the flow into the secondary-side loop. Its geometry and interfaces follow the approved drawing.

Integration, not equipment

The CDU itself is customer-selected equipment, supplied by you or your CDU vendor. Our work is to integrate that unit into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules.

The coolant distribution unit is equipment you select and buy; this page covers the fabricated pipework around its outlet flange, not the CDU unit. We do not manufacture CDU units.

Have a drawing to review?

Send the drawings. We review the build.

Geometry, interfaces and quantities come from your released drawing. Tell us the loop and the interfaces you need to meet.

Request a Quote ↗