Quick contact WhatsApp +86 15975701348 Email fantine.yijia@gmail.com
YiJia CoolSecondary-side piping & manifolds Request a Quote

Home/Resources/Decisions before release

Resources · Specification review

Decisions to Settle Before a Piping Drawing Is Released

A short review list for specifiers: loop boundary, interfaces, port geometry, materials, support and inspection requirements — the details that keep a fabrication package unambiguous.

An unrolled technical drawing with a stainless manifold sample and caliper on a workbench
Fabricated stainless pipework and connection hardware for secondary-side liquid cooling loops.

Mark the boundary first

Show which side of the CDU outlet flange each line belongs to. Confirm the supply and return take-offs, the flange standard at the interface and which components sit inside our fabrication scope.

Fix geometry and interfaces

Confirm port count, pitch and orientation, branch geometry, bend radii and the standard for every connection. State which valves, quick disconnects and hoses are customer-supplied and which are to be fitted into the assembly.

State materials and inspection

Specify the stainless grade (AISI 304 or 316L), the support or frame requirements, and the inspection and test requirements the project expects. Those details belong in the released drawing set, not in a later message.

The coolant distribution unit is equipment you select and buy; this page covers the fabricated pipework around its outlet flange, not the CDU unit. We do not manufacture CDU units.

Have a drawing to review?

Send the drawings. We review the build.

Geometry, interfaces and quantities come from your released drawing. Tell us the loop and the interfaces you need to meet.

Request a Quote ↗