Engineering notes · Boundary guide

Primary Loop vs Secondary Loop in Data Center Liquid Cooling

Where the facility water system ends, where the technology cooling system begins, and which piping scope belongs to the CDU outlet flange. Written for specifiers marking up a P&ID before an RFQ goes out.

In one paragraph

The primary loop and the secondary loop are the two coolant circuits separated by the coolant distribution unit (CDU) in a liquid-cooled data center. The primary loop — also called the facility water system (FWS) or primary fluid network (PFN) — brings facility water to the CDU. The secondary loop — the technology cooling system (TCS) or secondary fluid network (SFN) — carries coolant from the CDU outlet flange to the racks and back. YiJia Cool fabricates piping for the secondary side only.

Our fabrication work covers projects in the United States and Malaysia. Country-specific standards, units and documentation are taken from the project specification supplied by the design team, not assumed in advance.

The equipment, the packaged solution and the fabricated pipework are supplied by different parties; our liquid cooling solutions supply-scope guide sets out that split and how to write an RFQ around it.

Where exactly is the FWS / TCS boundary?

The boundary is the heat exchanger inside the CDU and, for piping purposes, the flange where conditioned coolant leaves it. On one side sits the facility water system: chillers, plant piping and the heat rejection chain that a mechanical contractor scopes as a building service. On the other side sits the technology cooling system: the closed loop of conditioned coolant that reaches the racks and the IT equipment.

Because the two circuits meet at a single piece of equipment, drawings often blur them. A P&ID may show both on one sheet; a mechanical package may list them under one heading; a request for quotation may simply say "liquid cooling piping". Before we quote, our engineering review marks every line as upstream or downstream of the CDU outlet flange. It is the fastest way to prevent a scope error that only becomes visible at installation.

PRIMARY LOOP · FWS / PFN Chillers / plant Facility water Heat rejection CDU heat exchanger flange boundary SECONDARY LOOP · TCS / SFN Supply header Manifolds Racks / return YiJia Cool scope: downstream of the flange only. Everything upstream belongs to the primary side.
FWS / TCS boundary at the CDU outlet flange. Marking this line on the P&ID is the first step of our engineering review.

One terminology trap is worth naming. "CDU connection piping", "CDU-to-rack piping" and "CDU outlet to rack piping" all describe pipework on the secondary side — the lines that connect to the CDU, not the CDU unit. An internal distribution block of the CDU, by contrast, belongs to the CDU unit itself and is not part of our supply. If a drawing uses the shorter phrase, we ask which is meant.

FWS vs TCS: what changes across the CDU?

The two loops serve different masters. Facility water is a building utility sized for heat rejection. TCS coolant is a process fluid that circulates above live electronics, where a leak has consequences that a plant-room leak does not. The table below is how we frame the comparison during a drawing review.

Primary loop (FWS / PFN) compared with secondary loop (TCS / SFN).
AspectPrimary loop — FWS / PFNSecondary loop — TCS / SFN
Where it runsPlant room, risers, heat rejection chain, up to the CDUCDU outlet flange to row / rack manifolds and back
Typical vocabularyFacility water piping, FWS plant piping, chilled water system, cooling plantTCS loop, SFN piping, supply and return headers, rack drops
FluidFacility water, set by the building services designConditioned coolant set by the project — deionised water, glycol blend or approved fluid
Who usually specifiesBuilding services / mechanical contractorData center MEP engineer, CDU vendor and rack supplier together
Consequence of a leakMaintenance event in a service areaLoss event above energised IT equipment
YiJia Cool scopeNot suppliedFabricated, inspected and documented

The last row is the reason this guide exists. We are a custom fabricator and integrator of secondary-side piping, manifolds and assemblies — custom non-standard pipework, drawing analysis, a proposed piping solution, integrated prefabrication, on-site assembly and CDU liquid cooling piping product integration. We integrate the CDU you select into the piping package, but we are not a CDU vendor: we do not manufacture the CDU unit, the facility water side, the rack IT equipment or a complete cooling plant. Final system acceptance stays with the parties named in the project specification.

What is a TCS loop, and what does it contain?

A TCS loop is the technology cooling system loop in its physical form: the stainless supply and return headers, the row and rack manifolds, the CDU-to-rack piping runs, the prefabricated spools and the fittings that join them. When a specification refers to the secondary fluid network (SFN), it is describing the same circuit at an architectural level; when it refers to SFN piping or distribution piping, it means the fabricated parts.

There is a useful distinction here between "network" and "piping". A network is a topology — where coolant flows, where it branches, where it is isolated. Piping is what gets cut, bent, welded, passivated, inspected and crated. We work in the second sense. Our secondary-side cooling loop piping page describes those parts in detail, and row and rack manifolds covers the branch geometry that fixes most of the drawing.

Material selection follows coolant chemistry and the internal surface condition required by the specification. We work in seamless AISI 304 / 316L tube with argon-shielded TIG and orbital welding and passivation; material documentation and traceability are agreed with the order and stated in the project specification. Materials and fabrication sets out the scope of each process.

How does data center liquid cooling loop architecture define our scope?

Read from the heat source outward, a typical architecture runs: IT equipment and rack-level heat exchangers, rack manifolds, row headers, secondary-side distribution piping, the CDU, facility water piping, and the heat rejection plant. The CDU is the hinge. Everything from its outlet flange toward the racks is the secondary side; everything from its inlet toward the plant is the primary side.

For a specifier, that architecture translates into a short set of scope questions. Which party owns the CDU supply? Who defines the coolant and its acceptance limits? Where are the isolation and balancing points? Which interfaces are purchased components and which are fabricated? Who holds the verification records and the material documentation? Answering these on the drawing prevents two suppliers from assuming the other owns a flange, a branch or a record.

It also settles the phrases that cause the most trouble in enquiries. Language implying that one party takes responsibility for the whole chain does not describe our engagement. Ours is narrower and easier to contract: drawing-based fabrication and factory assembly of secondary-side piping, with engineering samples before batch production. Build-to-print fabrication sets out that sequence.

Why do "primary side" and "secondary side" cause confusion?

You will see "primary side" and "secondary side" in CDU datasheets and heat-exchanger documentation, where they describe the two faces of the exchanger rather than two piping packages. In piping specifications, the clearer terms are FWS and TCS, or primary loop and secondary loop, or PFN and SFN. We use those consistently and spell out the abbreviations on first use.

The distinction is not pedantry. An enquiry that says "secondary side piping" may mean the pipework downstream of the CDU outlet flange, or it may mean the coolant side of the CDU heat exchanger itself. The first is our scope; the second belongs to the CDU vendor. Marking the boundary on the drawing removes the ambiguity.

What about a primary loop manifold, UQD, or a distribution block inside the CDU?

These three turn up in the same conversations and are frequently grouped together, so it helps to separate them:

Terms that appear together on drawings but sit on different sides of the scope line.
TermWhat it meansOur position
Primary loop manifoldA distribution header on the facility water sideOutside our supply; appears here only as a terminology reference
CDU-internal distribution blockAn internal component of the CDU unitOutside our supply; an internal part of customer-selected equipment, not fabricated or quoted by us — we integrate the unit's external piping only
UQD, blind-mate, valved connectorQuick-disconnect interface between a manifold and a rackPurchased components, integrated into prefabricated assemblies to the approved drawing

We integrate interface parts into a prefabricated assembly so the loop can be assembled on site, but we do not manufacture them and we do not present their approvals as our own. Fittings and interfaces lists how those connections are specified. Likewise, documentation of a material or a process is not a system-level approval of an installed loop.

What this means for your piping specification

Five checks make a secondary-side piping enquiry straightforward:

  1. Mark the boundary. Put the FWS / TCS boundary on the P&ID and state which side each line belongs to.
  2. State the operating envelope. Coolant, chemistry, flow rates per branch, temperature and pressure.
  3. Identify every interface. Size, type, and whether it is purchased or fabricated.
  4. Put acceptance criteria in the specification. Include the test method and stabilisation time. How an acceptance criterion is set explains why we ask rather than assume.
  5. Issue a drawing revision. Keep verification and material records tied to that revision.

With those items in place, our drawing analysis can return a proposed piping solution and the manufacturability questions before any material is committed. Our AI data center piping page describes the application context, and the quotation itself follows the approved drawing.

Short answers

Do you supply facility water piping or FWS plant piping?

No. Facility water piping, chilled water systems and the cooling plant sit on the primary loop and are outside our scope. We fabricate pipework downstream of the CDU outlet flange.

Is the CDU part of your scope?

The CDU unit is not manufactured or supplied by us — we are not a CDU vendor. But integrating the CDU you select is part of our scope: CDU liquid cooling piping product integration builds it into the custom piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules. References to CDU connection piping or CDU-to-rack piping always mean the secondary-side lines and their interfaces, never the CDU unit or its internal components.

Do you quote primary loop manifold assemblies?

No. A primary loop manifold is a facility water component. We build secondary-side manifolds, headers, spools and welded assemblies to the approved drawing.

Can the loop include UQD or blind-mate connections?

Yes, as purchased interface parts integrated into a prefabricated assembly to the drawing. We specify the fit-up and verify the finished assembly; we do not manufacture the connectors or claim their approvals.

What should we send if the drawing set is not finished?

A P&ID or isometric with flow rates, coolant type, interface points and the drawing revision is enough to start an engineering review. We will list the dimensions still needed before fabrication.

Which abbreviations should be used on the drawing?

FWS / PFN for the primary loop and TCS / SFN for the secondary loop. Spell each out on first use, and avoid "primary side" / "secondary side", which describe faces of the CDU heat exchanger.

Request a quote

Scope it once, on the drawing.

Start with the core inquiry details and describe the CDU outlet flange in the project-details field. Our engineers confirm which lines fall on the secondary side before quoting; the P&ID, isometric or STEP files can follow by email after submission.

Name, company & work email
Phone & project country
What you need
Drawing status & project details
Start Your Inquiry Custom non-standard piping solutions: drawing analysis, a fit-for-purpose solution, integrated prefabrication, on-site assembly and CDU liquid cooling piping product integration. We integrate the CDU you select into the piping package; we are not a CDU vendor and do not manufacture the unit. Primary-side plant is outside our scope.