In one paragraph
A liquid cooling manifold is a fabricated stainless header that splits a coolant supply into several branches and collects the return, either along a row or inside a rack. YiJia Cool builds row and rack manifolds to the approved drawing revision as part of the secondary-side cooling loop piping. We control the body, the ports, the welds, the fit-up and the inspection record; quick-disconnect and blind-mate connectors are purchased parts integrated into the assembly, not manufactured by us.
Rack and row manifolds are our primary product line, fabricated in Foshan for projects in the United States and Malaysia. See rack and row manifolds for the formats, the port decisions and the market coverage.
The equipment, the packaged solution and the fabricated pipework are supplied by different parties; our liquid cooling solutions supply-scope guide sets out that split and how to write an RFQ around it.
Which manifold formats do we build?
Manifolds are grouped by where they sit in the loop and what the drawing asks them to do. All four are drawing-controlled; none is a fixed SKU.
| Format | Position in the loop | Geometry set by the drawing |
|---|---|---|
| Row manifold | Along a row, feeding rack branches from the supply header | Branch count and pitch, header length, isolation positions |
| Rack manifold | Inside a rack, distributing to individual rack connections | Port count, port orientation, connection type, envelope |
| Distribution header | Between the CDU outlet and the first row branch | Line size, flow rate, branch take-offs, support points |
| Custom manifold assembly | Any welded assembly combining ports, brackets and interfaces | Full fabrication drawing, weld map, inspection requirements |
Because the row and rack manifolds fix the branch geometry, they are reviewed together with the headers and spools that connect to them. A tolerance that looks harmless on one body accumulates across a multi-branch header; our note on tolerance stack-up on multi-port manifolds explains where that shows up.
Where does the manifold sit in the secondary-side loop?
Read from the CDU outlet flange toward the racks: supply header, row manifold, rack manifold, rack connection, then the return path back to the CDU. Everything in that chain downstream of the flange falls inside our fabrication scope. The CDU unit itself is customer-selected equipment that we integrate into the piping package through outlet-flange interfaces, valve groups, bypasses, supports and connection modules — we are not a CDU vendor and do not manufacture it. The primary-side plant is outside our scope.
What does a specifier decide before release?
Most manifold problems that surface at installation were already decided — or left undecided — on the drawing. This is the checklist our engineering review works through before material is committed. It is the part of the conversation a product catalogue cannot answer.
| Decision | Why it matters | What we return at review |
|---|---|---|
| Port count and pitch | Fixes the branch geometry and the space needed for each connection | Fit-up conflicts, minimum spacing, bracket positions |
| Connection type | Determines whether the joint is pressed, welded, threaded or flanged | Tool access, hot-work restrictions, inspection method |
| Joint strategy | Follows coolant chemistry, service access and the required record | Recommended method per joint, with the trade-off stated |
| Tolerance stack-up | Small deviations accumulate across a multi-branch header | Critical dimensions and where to hold them |
| Internal surface condition | Drives cleaning, passivation and handling after fabrication | Cleaning regime and packing requirements |
| Verification and records | Belongs in the project specification, not in a catalogue | What we can record against the drawing revision |
We do not publish a universal leakage figure or a fixed acceptance limit. A number detached from the test method, the stabilisation time and the assembly volume is not meaningful. The criterion comes from the project specification; how an acceptance criterion is set explains why we ask at review rather than assume.
How does the drawing control the build?
Six dimensions of the build are fixed by the drawing revision. None is selected from a standard product list.
Body format
Header diameter, wall thickness, overall length and the position of brackets and supports follow the fabrication drawing. Where a row and a rack manifold share an envelope, both are reviewed together so the support points do not clash.
Material basis
We work in seamless AISI 304 / 316L stainless tube. Grade selection follows coolant chemistry and the internal surface condition the specification requires, not price. 304 vs 316L for coolant-wetted parts sets out how we frame that choice, and materials and fabrication describes the processes behind it.
Port arrangement
Port count, pitch, orientation and end preparation are taken from the released drawing. Port geometry is usually the hardest item to change after a revision is issued, because it propagates into the spools that connect to the body.
Welding and finish
Argon-shielded TIG and orbital welding are used where the tube is accessible and the purge can be controlled; V / M-profile press fittings are used where hot work must be avoided. The joint strategy is agreed before fabrication — see press vs orbital weld vs threaded.
Cleaning and passivation
The cleaning regime follows the coolant and the internal surface condition stated in the specification. Assemblies are cleaned, passivated and capped before packing so the internal condition is preserved in transit.
Fit-up and handoff
Dimensional inspection and the verification record are tied to the drawing revision and travel with the packed assembly. Material documentation and traceability are agreed with the order and stated in the project specification. One prefabricated spool, from drawing to shipment describes the sequence end to end.
Interfaces we integrate but do not manufacture
UQD, blind-mate, valved connectors and customer-selected fittings are purchased components. We integrate them into a prefabricated assembly to the approved drawing so the loop can be assembled on site, and we specify the fit-up and verify the finished assembly. We do not manufacture those connectors, and we do not present their approvals as our own. Fittings and interfaces lists how those connections are specified.
The wider engagement is custom and non-standard: we analyse the drawing, propose a fit-for-purpose piping and integration solution, manufacture and factory-assemble the secondary-side piping, manifolds and integrated welded assemblies, and support on-site assembly. Final system acceptance remains with the parties named in the project specification — see build-to-print fabrication.
From drawing to shipment
- Analyse & propose. We mark the CDU outlet flange boundary, check port geometry, propose a fit-for-purpose custom piping solution and return manufacturability questions before any material is committed.
- Joint and material agreement. Grade, wall thickness, joint strategy, cleaning regime and required records are fixed against the drawing revision.
- Fabrication. Bodies, ports, welds and fittings are built in our Foshan workshop to the released drawing.
- Inspection and packing. Cleaning, passivation, dimensional inspection and labelled packing as spools and assemblies.
- Handoff. The record travels with the assembly, tied to the drawing revision. On-site assembly of the integrated package can be included in our scope.
Short answers before you send a drawing
Is a manifold a catalogue product?
No. Port count, pitch, connection type and acceptance criteria are set per project. We maintain base component families, but each body is engineered to the approved drawing.
Can you work from a P&ID rather than a full CAD package?
Yes. A P&ID with flow rates, coolant type and interface points is enough for a review. We list the dimensions still needed before fabrication.
Which stainless grades do you use?
Seamless AISI 304 / 316L tube. The grade follows coolant chemistry and the required internal surface condition, not a default setting.
Do you supply the quick-disconnect connectors?
They can be included as purchased parts integrated into the assembly to the drawing. We do not manufacture them or present their approvals as our own.
Do you publish a fixed leakage rate?
No. The acceptance criterion belongs in the project specification, together with the test method and stabilisation time. We record against the drawing revision.
Can you produce an engineering sample?
Yes. A sample can be produced before batch production, and lead time is quoted against the approved drawing.